Saturday, March 7, 2009

March 7,2009 Special Workday Again

The Romans had a working plumbing system about 50 A.D. Joshua Tree gets air and water to the steaming bays in 2009, just in time for the meet. Imagine if you will; six water spigots and twelve air valves for your steam up pleasure, leaving the much improved over its' predecessor, the air manifold, as a forgotten piece of equipment of yore. No more dragging the water hose around, as it was always as far away as possible when you needed it and leaking as well, and with a kink in it to restrict or shut off flow to boot. And the air manifold, as much as it was an improvement over individual air compressors thumping at one's feet and under them as well, being able to just reach under the bay or to the one beside yours like one does at all other facilities will be great.

Saturday, Greg and I left the big city in the rear view mirror and came out for completion of two important projects. Greg's' project was to finish painting and installing of the finger guards for the hoist trolley. And to spray some paint on the welded areas of it as well. That last finishing touch before the meet. His handy work looks fine and you are sure to notice it when you unload.

My project was to finish the water spigots and piping at the bays. Time did not allow me to finish as well as I ran out of piping too. So it was trenching time early in the morning as soon as Bill Shepherd finished welding the air risers to the legs. Bill had run a temporary electrical line so the welder could reach to the far bay. The water lines were connected and tested, Bill welded these riser to the bay legs as well. The trench was back filled and tamped and we even had water to use to compact the soil back to level.

With those two things over it brings to a close three great improvements to the physical plant at JT. Water, air and a larger, safer way to unload. With the coming months we will finish the yard tracks above the hoist and it will serve us well in the coming years as a temporary storage area during busy operations.

Bill Shepherd has been busy this past week too. The front gate has a new look. The electrical is completed for the hoist and air compressor there. Today he was pouring the floor for the deck and steps were you will gain access to the yard area above the hoist. He has finished the wall around the hoist area and is soon going to work on the viaducts over the wash. There was a flurry of activity around the place today as the 15" crew was working up on the plateau. And there was activity around the campground as well with pruning and watering. Things are greening up, the trees are starting to bud out and the grass is poking its way up everywhere, Spring is on its way. It promises to be a good wildflower season real soon, don't miss it.

Well, I certainly hope it is in your plans to make it out for the Narrow Gauge Meet it promises to be a great weekend in many ways. See you there next weekend, March 12, 13, 14, 15, 2009

Sunday, March 1, 2009

Extra Work Weekend, February, 28; March 1, 2009

Having just a few things to get done before the Narrow Gauge Meet coming up in March, Three Companies decided to call an extra weekend to finish and polish some construction projects around the tracks. First on the list was to get the air lock controls for the lift operating. Temporary tubing was run to see how well it would work and replace the two by four blocks that were being used. Of course as soon as we got the tubing installed a better way was thought up and in time we will convert the system to reflect those ideas.

After getting the lift in full operating condition the ceremonial first unloading was staged. Dad backed up his truck and as everybody was assembled for the fete, Greg and I uncovered and unstrapped the GE and flats so it would be a speedy affair. With the video going; the engine and cars were off loaded and on the new lead track in less then two minutes.

The Thompsons made it out for the weekend too, Bruce just had to stop and donate money to the Indians at Morongo on his way out and Mike and Nathan got out before the sun set on Friday as well. Mike's project has been to extend the track north of Palmer Bridge and we have found a suitable spot to wrap up the extension so we can all focus on the high Line in the near future.

Paul Westover stopped in on his way back to work in the Tucson area and was seen moving boulders on the upper High Line most of the day on Friday. He found out first hand how tricky the Jays are once they see what you have to feed them. After sharing his trail mix with the beggars, he put the bag back in his truck. Being it was a warm day he rolled the windows down about two inches to let the hot air out, and to let the nosy Jay's in too. Soon there was a Jay in the truck but he couldn't figure out how to get out. Paul figures next time he'll let the truck get hot instead of getting pilfered by the birds.

Bill Shepherd is back in town, he made the long trip down Friday and rolled in to camp about late:30. After resting up and unloading all sorts of new goodies for the club he proceeded to complete the block work on the 'Gazsi Bay'. Sunday afternoon we ran a mud train from the hoist area where the mixer was to the bays to fill the cells of the wall. The track will be secured down to the wall on the 7th as well, giving us a full complement of bays for the meet. Bill's next project was to complete the steps at the hoist area and I'm sure that is curing already in the High Desert springtime air as we speak.

Brendon and Ace Hilton came out for a spell on Sunday and Brought Along Kim Ziepke to work on the old Ford tractor. Not taking long to figure out all the problems it was soon heard running around. The bucket that has for years sat along the road is now at home near the tractor. They spotted an old Cat D-4 on the way out and it is now in Hesperia at Brendon's. Took 'Zip' no time at all to figure it's problems out and now there is another piece of heavy equipment to carve up the landscape.

Westover started trenching for the air and water risers at the bay over the weekend and by Sunday afternoon the air risers were in place ready to weld to the steaming bay legs. The water risers should be finished up on the 7th, during a last ditch effort to have all ready for the Narrow Gauge Meet. Things are shaping up nicely and anticipation is building to see how well things work for the up coming meet. The Narrow Gauge Meet will be a play weekend for Three Companies and I hope you all come to enjoy yourselves too. See you there, Brian

Wednesday, February 18, 2009

Presidents Day Weekend, February 2009


Presidents Day Weekend at Joshua Tree

The weather man was right it was going to rain this weekend, at 9:00 am on Monday it started raining. The rest of the weekend was the standard; cold nights and T-shirt days as long as the sun was out.

Paul Westover came down from Tehachapi Thursday afternoon and offloaded another one hundred feet of track panels for the 7½”. I meet him at Barr Lumber around 11:00 on Friday, as I came into town, to pick up a few items that we would need to finish off on the hoist project. It sure is neat to get out a little early for a long weekend and even better when you get to stay a day longer too.

Terry Watson was up and waiting when we hit the gate, eager to see what was in store for the coming day. Al and Lynn Ratliff came in the gate not twenty minutes after we did; it is nice to have Mom and Dad make it out after not being able to the past couple of times. We got the trailers set up and even unloaded the GE before the sun dropped over the edge and the cool started to take over. Tom Arnold was up for the weekend too, and we put him to work the whole weekend.

Saturday dawned with nary a cloud in sight and soon as the sun reached the valley floor the temperature rose as quickly as the sun. By 10:00 it was not necessary to have more then a t-shirt on if you were in the sun. Saturday night I had a pretty good sun burn going on the nape of my neck, I completed it on Sunday. Greg made it up pretty early Saturday morn’ with the non-used section of the hoist, it will be used about the hoist area, just not on the lift. The end track sections of the hoist were fitted and refitted before welding them in place.

The header plate on the block wall was secured to the block work with the remaining fasteners. After that was done the track crew could build the remaining track panel to length and grade it. They also started on the two outer lead tracks from the lift, as there will be three tracks to choose to off load to from the lift. Terry Watson brought out his hammer-drill motor to put the holes in the wall for the header plate. Gary Conley assisted with the drilling and tapping of holes to secure the rail to the hoist trolley.

And visitors in the gate during both days, Ray and Sunny Martin, their son Matthew assisted in the work of the weekend. He is a member of So Cal Live Steamers and was camping down the road. I do believe we will be seeing more of them in the future. By Saturday evening all that remained to see the hoist operate was electrical and air. The air could wait and could be bypassed but the electrical was Sunday’s project. On the track side of things the track crew had laid sixty feet of panels and had rough graded them as well. The grading for the third lead was pretty far along too. And it too would get attacked come Sunday as well.

Sunday morning the Heisler got a steam up and ran for an hour or so, she is developing a lope and needs a little more attention then she has been getting, so back to the bays she went. After the sun hit the hoist area it was back on the project, with the fish tape in hand we ran the electrical to the pump motor and ran the air line inside the conduit as well. After filling up the reservoir for the hydraulic fluid we soon found out that the lines were crossed; it had been a year since we disassembled them, at least everything is now well lubricated.

After we figured that out, we ran the hoist up and down a few times to get the air out of the line and it was time to give it a test. Everyone was to pick a spot a go for a ride. Pictures were taken at the lowest setting; on the ground. And then I raised it to the top and took another shot for posterity. Top of rail is 11 3/16” at lowest and 6 foot 5 ½” at highest.
Gary and Allan worked on the sheet metal for covering the wheels as to keep from running over fingers during movement. All the new track panels got rail joiners attached before sundown on Sunday. And most of the track got at least a token ballasting before dark. Quite an accomplishment for all that lent a helping hand, a big pat on the back for all.

Sunday evening saw all leave except Mom, Dad and I, quiet came back to the campground and the evening was warmer then the two previously. The cloud cover was coming in and by mid morning Monday the much talked about rain was finally coming down. Being antsy to do things while having a morning about the place, I figured with the string line and a few stakes, the radii of the existing curve and duplicated it on the other lead track. That made the yard look better. Soon I was digging out along the upper side of the lead tracks for a tie retaining wall to keep the sloughing sands at bay and to give one a decent walking path while traversing the area. The GE and a few flats did the yeoman work of transporting the heavy ties to the worksite.


The rain was getting serious by now and the first break in the clouds Dad and I loaded things in the respective trucks and secured them for the trip home. We picked the right time as it really never let off again till after I left at least and it rained all the way home for me. It even was trying to snow at the top of Morongo grade on the way out of Yucca Valley.

A great weekend, with a lot accomplished by those that made it out for the weekend, one more session on the yard switch and grading the lead tracks and we will have a functional, larger and safer way to load and unload equipment. I’m looking forward to seeing it in use as I’m sure you are too. See you at the Narrow Gauge meet March 12-15, 2009.




Photobucket Album

Sunday, February 8, 2009

Hoist Workday Photos, February 7, 2009

Photobucket Album

These are the pictures for the below story, some day I'll figure out how to get them where I want them. Sorry about the Baloney from Photobucket wanting you to post a comment, that's what we get for free, Brian

Hoist Workday, February 7,2009

Greetings all, young and young at heart,

Saturday was wet and the weather man said; more wet to come. Greg and I got an early start from Corona and the weather cleared up more as we traveled easterly. Snow dusted the upper reaches of the mountains as we passed through the Banning pass. The fans were turning in the desert keeping the place cooled off as if it wasn't cool enough. It never really rained on the trip out but you spent most of the time adjusting the intermittent wipers to keep from hearing the screech of dry blades on the windshield, then turning them up for better visibility.

Brendon Hilton and his son Ace spent Friday night out there and he said it rained all night. The place was wet, but water had not run in the roads or either of the washes, so the precipitation was soaking in well, anticipate a good crop of wildflowers this spring.


An Easy-up was one of the things loaded in the truck, as well as everything else we thought we would need for the day. It was the second thing to be set up at the hoist location when we arrived, the first was the fire barrel for some heat. First project was to wire up a receptacle for the welder. The second was to go to Barr Lumber and buy a new pigtail for the welder so it would fit the receptacle. The welder still had a plug from when it was used by the Romans to re weld chariots. Then would you believe that one of the tabs in the breaker box was dead and of course that was the one that we plugged into when we ran wire to the hoist in January. With all the start up fits out of the way, we started welding the trolleys on the transfer table.

Not being the most proficient welder in town the easiest way for me to get a decent weld was to flip the table over and weld the bottom first then turn it on its side to weld them.

After we flipped it back over, installed the rollers and placed the roller track on the cross supports it became evident that our planning and engineering had paid off. She rolled with the greatest of ease. We bolted the sheet metal guards over the lifting ram and put the cover over the hydraulic controls. A few hydraulic fittings to go to get them to work and wiring for the pump as well as the plumbing for the air system is pretty much all that is left in that area.

The day was cool, but the turnout for the 15" boys for their workday was good. People drove by in and out most of the day. We even had a Cadillac with Illinois plates on it show up, Nick Kallas from the Illinois Railway Museum in Union, IL was in town and spent the morning trying to find us, he was also looking for an open observation Pullman car the was supposed to be around here he said. I sent him up to Pioneertown to go see it after he left. Terry Watson gave him the cooks tour of all the cars and the Museum too. It sprinkled a few times during the day as the clouds scudded past on their way east. The fire barrel keeping us warm and the cover keeping us dry.


The bridge plates to the yard and the rail on the transfer table will get welded up this week and put in place next weekend. We will be able to finish the center track to the hoist and start on the two outer tracks as well over the Presidents Day weekend run. There should be no reason that the hoist will not be ready to be put in use for the Narrow Gauge Meet. The Yard will not be complete, only one track will be in service up to the main line. We have a few switches to complete before that happens and we are looking into finding some switch parts to ease this along.


The rest of the day went quickly and soon the sun was dropping over the edge. Greg and I made a trip up to see the progress on the 'hernia' gauge, they had welded up some pieces on the turntable and had started grading the roadbed towards the big cut. The temperature was sure to be lower as the evening progressed as the sky was clearing. A group formed around the patio area and it was getting time to leave even though to fun was just starting to pick up. The ride back home was uneventful and we didn't see rain again till we were almost home. A lot accomplished for a day that was supposed to be rained out. Keep an eye out for the invitation to the cocktail and dedication party at the 'Hoist' at the Narrow Gauge Meet.

Tuesday, February 3, 2009

My new home

February 3, 2009

Welcome to my new home for info on the happenings on the 7 1/2" at JT. Tom Arnold set this up so it would be easier for me to get out the stories, pictures and what else that tells what is going on at Joshua Tree. I'm working on the text part right now and I'll get to the photos part later. Technology gets the best of me sometimes. OK, most of the time, I'm still looking for a font that looks like my old 'Corona', not Smith-Corona, typewriter; 'o's and 'p's that are filled with fuzz, off kilter 'l's and the 'a' that is lighter because of a broken pinkie finger, etc...

We, Greg and I, got a little work done on the hoist 'trolley' frame last night and are getting that ready for welding up to the rest of the hoist soon. Next run weekend, with a little work too, is going to be President's weekend, see you there, Brian

Sunday, February 1, 2009


Paul Westover took a few pictures of the progress Bill Shepherd had made in his last trip down to the digs. Paul picks up ties and rail on the way home. He and his dad are making track panels in Tehachapi and Paul is dropping them off on his way back to the current job on Tucson. At least he knows where his safety vest is. And now we have panels all ready for the new lead tracks at the hoist.



The steps for the hoist with the compresser room underneath the steps.



Yes, the Gazsi bay is going to be smooth face instead of split to lessen the 'cheesegrater' effect on your legs.