Wednesday, February 17, 2016

Sweetheart of a Weekend at Joshua Tree

This past weekend had Valentine's Day in it too, and the weather cooperated like a sweetheart. A t-shirt was good enough and even at night one did not need to bundle as they did earlier. This years Standard Gauge Meet was about standard; those that came out had a blast, we had up to six running at one time. John Barter brought out both the Ten Wheeler and the Consolidation for runs on the track. He even brought his Davenport 50 for dragging things around. All three saw some time on the railroad. Art and Claudia Barter pack the Shay in their truck and it ran around all weekend as well. Allan and Lynn Ratliff of course had the trusty GE 47 tonner, Jerry McPheeters has the Edwards Motor Car all dialed in and it ran quite a bit. Greg Ratliff was running JT&S #7 and it continues to run like a top. I hadn't ran the 4-4-0 since New Years and it was time to run. With six on the track at one time and all heads up operators we had everybody spaced out and as one pulled into the siding your approaching train was doing the same. It was running smoothly, and then of course it's lunch time, butt break, a trip up the high line and enough for a while and the rhythm falls apart....but is was neat to keep up one's end of the schedule and keep things running smoothly.
Bill Shepherd is back in town and it did not take him any time at all to be back at the task of the Conley Mansion. Saturday the Mud Sills were drilled and bolted down after he put the finishing touches of the concrete tops. By Sunday evening two of the wooden walls were standing, by Monday afternoon there was sheeting on two walls to keep things square and plumb. Doing a great job Bill. Tom Arnold was out for a few days and left Sunday morning.  John Griffin has been working on the station curve retaining wall as we have plenty of fill dirt real close by.
The Saturday night Steak Night burned well, Jerry had brought some of his Nipomo Red Oak for the fire and the steaks were great tasting too. Saturday after running we got together and mixed concrete and filled the wall cells of the retaining wall at the loading area. Bill Shepherd will be putting hand rails on the wall for keeping us from stepping into the wrong level of the wash. Continued nick nack clean up of the area and housekeeping chores that have been neglected were the order of things to do. Sunday Shelli and I ran loads of rocks and boulders from the switchback siding area down to the retaining wall project at the station curve so John Griffin didn't have to. The siding area is all cleared now and when we get all the pieces for switches and time and talent they can go in.
Sunday night was Trash Can Tri Tip night and I tried out my new quarter barrel for only doing one or two tri tips. It was a success and the six for dinner polished off two tri tips and put a real good dent in the fixings too.
It was a great weekend and plenty of good people, great trains, and beautiful weather. Things are greening up and the flowers are starting to grow, the Joshua Trees are starting to bloom we noticed on the way out Monday; the Narrow Gauge Meet on March 10-13 should be colorful. See you then.

Here is a link to pictures from John Griffin and I taken over the weekend. https://goo.gl/photos/ZYFoKUcdtjZBJmVC7

Sunday, January 31, 2016

Progress on the Conley Mansion

This past week great strides happened on the progress of the Gary Conley Building, the Conley Mansion will hold the displays from Gary's HO empire that was in one of the rooms of his house in Joshua Tree. It was quite a layout and the detail of the scenery was the real gem of the layout. The museum is building a structure to house the exhibit, the building will be behind the Moseley Station and below the 7 1/2" loop to the station. A western themed building in lines with the era of the station to blend in with the other buildings nearby. During the last two weeks the area was cleared, compacted and the foundation formed and concrete poured. Bill Shepherd is the lead on this project and he has had help from Bob Whitt on excavating the site, and I'm sure with other things as well. From the pictures we see that Tom Arnold was out to see the progress and John Griffin too. An other interesting addition to the Railroad and Museum.
As always with concrete project around here, Bill tries to make the most of the truck load if it is coming out. Bill excavated for a retaining wall on the South side of the 7 1/2" loading area also. This will allow us to put in another track for parking trains at busy times. Great work all of you. With the Standard Gauge Meet coming up in two weeks you too can come out and see the progress. Here is a link for a few pictures of the pour day.
https://goo.gl/photos/Vehz4H8h2VBnLXFF7

Sunday, January 24, 2016

Mid Winter Weekend 2016, January 15-18

It was time to get out of the damp cold Southern California lowlands and dry out. It might have been cold at night , but the days were enjoyable. Thursday evening Shelli and I made the run out. Allan and Lynn hadn't been there too long and the Industrious Bill Shepherd was back in town on top of that. A nice time around the fire and off to dreamland.
 Friday dawned beautiful and clear, with just a few high Cirrus, Horsetails telling us that the breeze might just be blowing elsewhere, but it was okay here.
Everybody seemed to have a project in mind and started into it early. Bill was exercising with his shovel at the loading area, the South wall is going in for the yard tracks; an erosion, aesthetics, accessibility, capacity project.
Enabling another track to be completed at the loading yard, a completed walkway to the raised area of the loading yard and a start to the two, close, steaming bays for short term visiting steamers. Allan was tackling a shrubbery issue that was soon to be gone, and continued the rearrangement of the wood pile. I hauled track panels up to the high line for installation over the weekend. Soon Bob Whitt arrived and the morning project evolved into the mid day projects, the area was cleared and leveled for the site of the new Conley Mansion; a building being erected between the south side of the station museum building and the 7 1/2" loop below the Car Barn to house the exhibits of Gary's HO scale railroad empire that was in his house in town.
A fitting tribute to the mini modeler, craftsman and tinkerer that he was. The dirt excavated was placed east of the station for easy removal by rail to any point on the 7 1/2" that needs good quality aggregate products. Another shipping point on our busy pike. A thirty bucket shipment to the end of the high line was squeezed into operations over the weekend for use in the last of the retaining wall that Bill is creating for us. Rumor has it that much of it will be used to complete the wall on the station curve too, a John Griffin project.
 There was time to run a railroad too, we unloaded Allan's trusty GE 47 tonner and train, the 4-4-0 was hauled to the steaming bays by the Davenport #7 as well as a string of utilitarian Westside 24' flats. A few circuits of railroading throughout the day to make the weekend as enjoyable as possible. Greg and Becky rolled in Friday night and that ended up to be the extent of faraway arrivals for the weekend.
Sixty feet of track panels were assembled and we are within 15 feet or so of the trestle abutment, it made for an easier route for that shipment of fill for the retaining wall/trestle abutment area.
The days got a little warmer all weekend as this time of year the days are mild if the breeze is low or non existent. The survey crew did a bit of trampling through the canyon above the trestle area, getting ideas and dreams aligned for the ascent of the mountain. Nothing is impossible, it promises to be interesting. A link for the pictures is here: https://goo.gl/photos/nej4AbwKrZJt3jdz9
All in all a very nice and productive weekend. Next month is the Standard Gauge Meet. February 12-14. Bring that sweetheart of an engine out too.

Sunday, January 10, 2016

A quick trip

Saturday, Greg, Matt and I made a quick trip up to The Tracks with a load of firewood for the picnic shelter. The winds of Christmas in the Southern California area blew a few branches off of Greg and Becky's problem tree. A plan to cut up the fallen wood, and split it and load directly into the dump trailer with a quick trip to dump it was hatched. Quite a pile it was before we split it and it filled the trailer to the top after with a full pickup load yet to go.
The rains we had in the low lands were much appreciated and after not having really any rain for two years a welcome sight. There was even snow on the mountains as we traveled out in the morning. The upper mountains had snow and the lower hills did as well. The upper elevations of the property had a dusting of snow but was gone by Saturday. A much deserved rain fell at the Club and it is hoped that we get more so it will be a very colorful Spring with wildflowers and shrubbery blooming. The weather was still on the lower numbers as we rolled into Yucca Valley, what water still around on the side of the road was covered in ice. After a stop for breakfast in town we drove up to The Tracks and unloaded the bounty.

The wood pile was given a lot of attention the past trip out, we sorted, stacked and burned a bit of it. Knowing we had a big load coming this weekend we made room for it. Even took some away to be split as the big pieces get neglected with so much easier pickings around. This load is already split so it will dry quicker and just needs loaded on the cart come next season. We did a quick trip around the railroad to see and show Matt the progress as he did not get to come out New Years and this years real job schedule will not allow him to be out for a while. We took the forms off of the new abutment and gave it an approval.
Next weekend at the Mid Winter Weekend we should be able to do a little back filling and our rock wall builder should be around so track can be laid right up to the precipice. Surveying and forming of the trestle piers is on tap for the weekend too, so plenty of opportunity for getting one with the railroad can be had.
Always something to see out in the desert, even a puddle of water can grab ones attention if one so desires.

The ice upon the puddle tells of the chill about, the water itself tells of the much needed rain fell in a quantity that will do well for the plants and animals as well. And the reflection of the sun gives us promise that it will warm as the days continue. Hope to see you next weekend, have a safe trip. Brian

Tuesday, January 5, 2016

New Years, 2016, at the Tracks

I've written one check and screwed up on the date already. Happy New Year from us at Joshua Tree & Southern Railroad and Museum. 2016 might have started with a big, but it wasn't big enough to wake me as I went to bed earlier then that. Thursday night was cold enough to crack a few hose bibs in the steaming area. And the popsicles from the repair stayed there in the shade for a day more. It was okay in the Sun and the skies were clear and bright on Friday.
Steve Nelson came out with Sydnie for the weekend and brought along the C-21 and a string of cars. Chris Burns rolled down from the North and had the Navajo Construction Cab for something to ride around on. Allan and Lynn Ratliff were out before us kids and Dad had the GE and enough flats to make his WSL #4 caboose look good. Greg and Becky brought out the Skeletons so his load of empties looked even better. Sydnie and Caleb even were spotted all weekend, and Colette and the pups had the Curve staked out. Shelli and I made it out after work on Thursday, a whole pickup load of goodies for the railroad, concrete and firewood.
Around the railroad John Griffin finished off the rock breaking project on the High Line and the grade is almost to the abutment of the next trestle, sans rockwork for a path up the spine of the mountain from the end of the curved trestle up to the Pauline siding area. So one does not have to walk the whole High Line to get up to the top. Bill Shepherd did the path work and this weekend it got a lot of foot traffic, so a well placed path it is. Even saw a few people up on Bill's path to the top of the mountain that heads off from the firebreak road too. The view is getting better the higher we go, and from the top you can see quite a panorama.
 Thursday and Friday the Tolan's were out, Jeff put in a few miles on his Chloe, he spent the summer doing a lot of bearing work and even painted her up, sure is looking and sounding good. It was good to see the whole lot of Tolan's Kevin and Lori, Jeff and Tiphani...and the dog.
Jerry McPheeters has taken over the repair, maintenance and operation of the Edwards Motor Car and 'Trailer', his first project was to get it back into good running condition with a going over of the drive system including the chain drive and idlers. It really has just been sitting in the back of the Car Barn for a number of years waiting for the right time. Jerry has done wonders with the girl and it is good to see it out and about. Having one person in charge of it and responsible for it keeps it from being neglected and not maintained. Enjoy Jerry, it looks good. John Griffin has been using the Freight Motor for a work engine for a few years now and of course he keeps that one in top shape as well. Bill Shepherd helped him with a nagging fuel leak on it over the last month or so.
Saturday was a bit warmer that Friday and we had quite a few visitors too. It is amazing how many find out about the place from the internet and drop on by. A few genuinely interested folks too, we just might see them back again, The 4-4-0 ran around on Saturday, The Nelson C-21, Burn's Construction cab, the Edwards and the GE 47 tonner; we had a track full of operations for a while. Over the weekend there was plenty to see at times, and sometimes nothing, that's just the way it goes.
Saturday afternoon Jerry offered a hay ride to those interested for a trip around his neighborhood in Landers, of course everyone made it back in time for Steak Night.
Sunday we spent some time up on the High Line and made the forms for the first abutment and even poured the concrete for it. The new location of the Batch Plant makes the distance the mixed concrete has to travel significantly shorter than it was getting to be, hence the move from down at Tedder. The raw material still makes the trip up the hill and we have enough room to move around the plant when we are a mixing. Right now water comes up in buckets, but the plan is a water line, and eventually a water plug for the steam engines. Wouldn't an old tank car like Tank Creek on the Silverton branch look okay?
 
The trestle piers will be located and formed and filled  in the next couple of sessions, and soon we will have another trestle to get us further up the mountain. Come on out and enjoy the scenery, the railroad and the high desert. See you in two weeks for the Mid Winter Weekend January 15-18.
A Picasa link for pictures of the weekend at, https://goo.gl/photos/dSbjtsijNMYF9XY97  any questions the usual E-mail is ratsgarage@yahoo.com

Saturday, December 26, 2015

The Early Days, as told by John Mueller

As some of you might know, there were five original partners in the Joshua Tree &Southern land acquirement. Joel Tedder, Charlie Barnes, Tom Coffey, Bob Palmer and John Mueller. Time and water have passed under the bridges of Joshua Tree and for a number of years I have slowly prodded John Mueller about the early days of Joshua Tree. Well, out of nowhere came a few emails and in them were a few stories of the days of yore. A few stories of when and how the full size equipment came to be and how it got where it is. I've kept it pretty much how John sent it to me, to keep the flavor as it is told. Enjoy a look back. Thank you John.


Hi Brian,
     I thought that I would attempt to give you some background about JT&S, so here goes.

    The first piece of equipment that came to J.T. was the caboose.  Joel bought the car from a scrap dealer in Mojave.  He got there just as the scrapper dropped a ball on the roof.  Thus breaking several of the ceiling/roof rafters.  That is the reason that Joel always propped up the roof.  He also bought some rail and a few ties.  He hauled the rail and ties in his trailer and truck and laid the rails himself.  I came on the scene just about that time.  The rail was laid approximately where the RPO car stands today.  At the time I was working at Diesel Control in Wilmington and had met a few high up people from Harbor Belt Line RR.  They laid the track for the OVERFAIR equipment, and we got to talking RR stuff and mention was made of the JT&S project and the need for rail, and ties.  The Superintendent of the RR was a very close friend of the then president CEO of the SFE, and he got permission to donate some rail the HBL had remove from a SFE siding.  I cut the rail in shorter lengths so that we could haul it to JT with out having to have a flatbed.  Got a load of ties also.  Next available chance I got Frank Venolia in the truck and he and I went to JT with the rental truck.  Unloaded the JUNK and returned home.  The next weekend we laid rail.  Tom and Lynnian came out, Aunt Ida, Joel and Pauline, and I.  We had a party to celebrate the railroad extension, steaks done on a cleaned off shovel held in the fire of the pot belly stove, delicious.  In the morning, we decided that the caboose should be moved to the end of rail because Joel was looking for more equipment.  We put Tom Coffey on the brake wheel, and Joel and I leaned against the caboose and it started to roll a little faster than we wanted it too and Tom was a little SLOW in winding the hand brake, and off the end of the rail she went, one axle, and everyone was in a tizzy trying to figure out how in the world we were ever going to get it back on the rail.  I went and got a tie, stuck it under the axle and using Joel’s hydraulic jack lifted the axle up high enough to roll it back onto the rail. Naturally the hand brake was not set and the Caboose went the other way.  I had a piece of chain that I managed to swing it under one of the wheels and that stopped it from rolling off the OTHER end of the RR.  This time I worked the hand brake while Joel pushed with his truck.  Then we all had a couple of beers, some hamburgers, and went to bed for the evening.  Next morning I left because I was working second shift a Redondo roundhouse.  Soon after this, Joel somehow managed to get a hold of the RPO car and in a short time, he had the Diner also.  So, there was more RR to build.  The end for now, but what comes next is really gonna tickle you funny bone (what, wherever that is). 
 John

 Second installment came a few days later, so I’ll just add it in as the second chapter.

Hey,

 I got things a little messed up in the first installment.

  The rail that the caboose sits on and the end of the RPO car also was the rail that Tedder bought from the scrapper.  The rail that Frank and I hauled up there came from Harbor Belt Line.  Everything else is pretty much as I imagine it.  The first thing in the caboose was a refrigerator that had a patch on the freezer coils, kept things cool but never cold.  We used ice chests for all the perishables.  Next thing was the electric range.  Aunt Ida sewed the covers for the foam rubber mattresses using denim for covers.  Then there is the caboose stove,  I don't remember if that was something that I picked up at ATSF, but anyway it did not have grates and did not have a base.   I had someone at ATSF weld up the base that it sits on, and I machined the stainless steel grate.

   Now about the roof---- If you look under the caboose and on top of the ties you will find, I believe, 4 pieces of 14 guage steel plate that was crudely cut to the shape of the roof.  These never were installed because there was so much "junk" on the surfaces that needed to be body ground off before installation.  It never got done because Tedder had a hard head, and I didn't own a body grinder at the time.  If you were to clean-up the ugly, and install one of them on each of the worst broken ribs, and drill 1/4 inch holes in the steel and the rib and install the proper length bolt and nut, you would not have to prop up the roof. 

  When I moved from Gardena to Williams in 1979, I took the big brownish colored refrigerator that I had in my apartment to JT and installed it in the caboose.

  The next venture was to put down the rail the RPO and Diner now sit on.  This was a lot of fun, especially with the ties we had gotten.  But, it was worth all the effort.  When the diner and the RPO were delivered to the siding at East Palm springs, it was exciting day.  The S.P. local had to move out some MOW equipment that had been stored there for several years so that the RPO and Diner could be set on the end of track for the movers to be able to get to them, and nothing wanted to roll.  So, it was move one car at a time, set them out on the siding, get another one, and so on.  Then they shoved the RPO and diner out there, one by one had to put the MOW equipment back.

  I believe it was a couple of weeks before Tedder arranged for the move.  That was a real happening.  You could hear those diesel engines (Truck type) from all the west of Joshua Tree.  They had dollies under the cars, and the car trucks were on another truck.  They had two tractors on the head end and one on the back end.  They moved both cars at the same time, but on separate trucks.  They brought the trucks up first and set them on the rail. Then put the RPO body on the trucks, and repeated with the Diner.  This was done in One day.

  Of course, there was a celebration.

  Then Tedder got busy and brought electric power over to the newest additions.  The caboose had electric from the first weekend after we moved it.  I was not around when they moved the Palmer's car in so I can not tell you anything about that.

  They only bent under the 15” gauge trestle (at the time) was pressure treated lumber that came from the sand tower at Redondo roundhouse.  I paid $25 and had it stored in the shop in Gardena for awhile. One day I got a wild hair and chalked up the outline of the trestle on the floor in the shop and began cutting things up.  Next weekend Tedder and I mixed up a batch of cement and poured enough stuff to make a footing for the bent.  In a couple of weeks we had the trestle in and had started to lay the circle of track.  I built the switch and the points and we put that in.  This was done so that we could connect the two ends of the stub track.

    Tom Coffey's Shay was the first engine to run on the rail although Tedder had built a "speeder" and used to play a lot.

  More on this later, it is getting late and I need to go to sleep.

  Have fun with this, John

Monday, November 30, 2015

Thanksgiving Weekend amongst the Joshua Trees.

Thanksgiving at Joshua Tree can be a weather crap shoot. Bet on cold, or colder. But the days can be nice too. Wednesday was COLD, Thursday was chilly with frost on things in the morning and was okay till about 3:00, then it cooled off again. Friday we wore the fire barrel out putting fuel into it. Even had a snow flurry or two, flakes that is. Saturday was great and we thawed out. Sunday was a bit warmer.
Attendance was decent for the holiday that it was. We didn't expect many and we weren't disappointed. George Lavacot rolled in Friday and spent the day with us. A pleasant surprise as he does live in Oregon. It was even a bit chilly for him too. Leone and Larry Fisher came out Saturday and spent the day, He took a couple of neat videos of their trip up the high line on Allan Ratliff's train. Allan's caboose, West Side Lumber #4, is star of the show in the first one as they back up the grade, enjoy them for their unique perspective and view.

  Bill Shepherd and Mary re-arrived and Bill is busy already on a few projects about the place. We had two trains running at times, The GE 47 tonner and JTSRR #7 ran a bit.
We moved rocks out of a campsite down to John Griffins wall project and even took rock down from the rock breaking project at the end of track down to the wall project on the Station curve.
 We'll be out again after Christmas to enjoy the New Year. The trestle portion of the high line should get a kick start then, looking forward to it, see you there.